Drainage Improvements Completed on Coastal Pathway

New drainage channel to catch water
seeping from the wall.
Yesterday afternoon, I walked along the coastal pathway from Douglas Terrace to the Stannergate. 

Just beyond the Grassy Beach Centre, on the raised section of the pathway, the building work to create better underfoot conditions has been completed.

A new drainage channel has been installed which catches the water seeping from the wall above and then takes this to a new drain.

Further down the slope on the seaward side of the path, a additional drain has also been installed so that any surface rain water does not collect and form a pool.


New drain to disperse surface water.
I trust this satisfactorily reduces the likelihood of poor underfoot conditions at this spot, which some of my constituents had complained about at the end of July.

I think this represents a comprehensive and very satisfactory response from the Environment Department, whom I first approached about this.