08/01/2012

Protecting the Seawall - Rapid Council Response

Coned off section of Fisher Street
above breach in the sea wall
On Thursday, I wrote to the City Engineer about a breach in the sea wall in Broughty Ferry, which I had identified after the recent storm force weather. On Saturday, I received thanks for bringing this to the the Council's attention.


I was also relieved to be told that the sea wall from Grassy Beach to Beach Crescent had been inspected on Friday and the immediately affected area had been coned off as a precautionary measure. I have also been informed that permanent repairs are to be carried out commencing on Monday 9 January 2012. Other areas of lesser remedial works to the sea wall will apparently be carried out at the same time.

In relation to the engineering report I had requested, it was reassuring for residents to know that the City Engineer had already instructed an inspection of the full Dundee coastline after the recent storms. Additionally he confirmed that consultants had already been appointed to carry out a study of the Dundee coastline and that the outcome of that study will be reported to a Council Committee.

Well done to the Council for responding promptly and comprehensively.