A joint press statement with Councillor Derek Scott
Councillor Laurie Bidwell said:
"A constituent alerted me to the potential dangers to children of the flapping wire mesh attached to bridge railings on the Dundee Road bridge over the Railway. This has a low set of metal railings, with large gaps that are covered by mesh wiring. I have raised this with Planning & Transport in the City Council to no avail. On Thursday 1st October a large unsightly concrete, block was dumped on the bridge presumably to block access to the hole in the mesh fence. Unfortunately, as well as being unsightly, I think is itself a potential hazard making it easier for children to scramble up and fall onto the railway."
Councillor Derek Scott said
“I first contacted Network Rail about this issue on 20 July and I have sent a few reminders since then. After all these weeks on I’m disapointed to discover that the apparent solution has actually makes things much worse.
Not only is the fence still damaged but now the already narrow pavement on the busiest route into central Broughty Ferry has been made narrower and there is an unsightly lump of concrete detracting from the general appearance of the area.
Network Rail would have had to have used a heavy vehicle and a crane to lower the concrete into place, how much simpler and cheaper would it have been to have sent a repair man round with a new sheet of mesh fencing to cover the hole in the existing one?