Pages

Showing posts with label Orchar Park. Show all posts
Showing posts with label Orchar Park. Show all posts

09/12/2013

Environment Committee Approves Play Area Improvements at Castle Green and Orchar Park

Castle Green Play Area in Broughty Ferry
At the Environment Committee on Monday evening 9th December, improvements were agreed to play areas across the city. For The Ferry these included play areas at Castle Green and Orchar Park. 

These proposals had been developed to address existing health and safety concerns and to enhance the amenity of facilities in each location. They should also help reduce the future maintenance burden on the Council Tax.

More specifically, these are the improvements that will be coming our way in Broughty Ferry:

Castle Green 
Install climbing nets and sand play equipment to enhance the site, replacing equipment that is beyond economic repair.

Orchar Park

Improve woodchip safety surfacing under play equipment.

13/11/2013

Public Open Space Improvements in Broughty Ferry

Windmill Gardens Broughty FerryAt the Environment Committee on Monday (11 November 2013), Councillors approved proposals to undertake Public Open Space Improvements (Report reference AN121-2013) at a number of locations. These had been developed by the Environment Department to enhance amenity whilst, at the same time, reduce the cost of long-term maintenance. Apparently, the proposed improvements would also help reduce concerns about health and safety.

In Broughty Ferry the following three schemes were included.

  • Barnhill Housing/Strathmore Street/Nursery Road - refurbish shrub areas and landscape to grass, improving maintenance;
  • Queen Street/Orchar Park/Inchkeith Avenue - regenerate hedging and rose beds, replace with new plantings and
  • Castle Green/Windmill Gardens - redesign and plant new flower beds.
At the meeting I welcomed these three improvements but queried why there were no plans included to cover the triangular area of public open space at the junction of the coastal pathway and Douglas Terrace. Part of this area had been damaged by successive contractors who had set up a temporary compound for building materials and equipment on this ground. I was assured at the meeting that this was to be attended to. On Tuesday I received an email confirming that the contractors who had been working there were being held to reinstate the flower bed and grass. While this commitment was also welcome, I have also asked for a redesign of this area because the rockery is crumbling, the other flower bed is overgrown with weeds and furthermore the corner by teh road has been become muddy and ill defined.